Bylok Build
🔨👷♂️ Caravan Salon Builder.
27/09/2020
Photos are of the new interior transformation. Last post showed it ready and usable for Wedding hair styling, managed one job, great! But along came Covid... So we decided best to take it in another direction, fitting it out as a fully functioning Hair Salon!
Adding now the wall hung cabinets, wash hair basin and a small sink with a tap, as well as a Hot water cylinder.
-1 cabinet with a small sink and tap. Removable bench top cut out, at the sink area.
-1 cabinet with a shelf and a hinged bench top cut out, for the wet towel drop.
-1 small wall mounted cabinet with LED strip light.
-1 floor mounted cabinet for the wash hair basin/seat squabs, also housing the hot water cylinder and plumbing.
03/04/2020
Our first day out (14/3/20) and first actual job for the Caravan! 🎉🍾 This was built to be used as mobile Wedding Hair van for my wife's business. It performed extremely well and exceeded all our expectations! Thanks for all the support and thanks to those who were part of this project/journey..
Miss Marlo & Co
Images by www.gregcampbell.photo
17/11/2019
The finishings off stages- Paint, Floor sanding, skirting and Architraves, bench seat build and the electrical. 🍾
Couple wall hung cabinets to make and signwriting, then completed.😊
24/04/2019
Ply lining completed with a negative detail finish..👍 one sheet at time.😒 Glued and temporally braced to cure then move on to the next. Definatly time consuming with so much too beware of.., probably wise I was able to be patient and i avoided nailing my finger again 😂. So not too much of this 🤬 was going on this time round.😂
26/01/2019
Big job installing EVA foam Insulation, glued between the framing to the Exterior wall and ceiling ply. Now..... I'm ready for the ply lining☝️👍
29/09/2018
I have now successfully installed window struts and window and door Hardware. Also carefully completed electrical pre wire. Phew... getting close now to lining.
29/09/2018
I installed Windows struts and window and door Hardware and Electrical pre wire completed. Next is Aluminum Insulation
25/07/2018
Cedar windows and facing boards done🔨👍.
05/07/2018
Stage 7
•Membrane paint.
-2 base coats black.
-4 top coats white
04/07/2018
Stage 6
• Ply cladding to walls and roof.
• filler and sand ready for membrane paint.
03/07/2018
Stage 5
•Frame and shape up new walls and curved roof.