Pagadian Solar
We are a Solar Panel Installer and Services, located at Tiguma Pagadian City Zambonga del Sur.
For site visits please contact us, network and WhatsApp:
Rely Asuncion +63 9193368447
Allan (bobong) Jumuad +63 9947930140
23/06/2026
Notice 📣📢📣📢
Power disturbance Zambo Sur.
CTTO
National Grid Corporation of the Philippines
Pagadian Solar
21/05/2026
Great experience at this big event..
2026 SMX Convention Center Manila
Ada Lin
12/04/2026
Calling all BDO Unibank clients, here's your chance. Grab it now...
https://www.facebook.com/100066547688034/posts/1293929699501941/?app=fbl
CTTO
01/04/2026
TikTok · user9155409366570 7551 likes, 1364 comments. “ # # #”
31/03/2026
At 1610H (4:10pm), 31 Mar 2026.
Grid: Electric Utility {ZAMSURECO I)
Production: Solar Power Energy
Load: Appliances (Induction heater, Aircon 1.5hp)
Battery: (No batt) (on grid setting)
It's FREE Energy from the SUN 🌞☀️.
Pagadian Solar
11/03/2026
Good news to our Government Personnel 🎺 📣📣📣
CTTO
MANILA BULLETIN Business
03/03/2026
Attention 📣📣📣
Power interruption from Zamboanga del Sur I Electric Cooperative, Inc.
CTTO
Pagadian Solar
20/02/2026
Attention consumers !!! 📢📢📢
Nindot kung naay back up power source sama sa solar power.
Inquire at Pagadian Solar
NGCP SCHEDULED POWER INTERRUPTION!!!
Date: February 22, 2026 (Sunday)
Time: 6:00am - 6:00pm
Duration: 12 Hours
Affected area/s:
• UPPER BAYAO Substation
• TIGUMA Substation
• STA. MARIA Substation
• BALANGASAN Substation
• SAN MIGUEL Substation
Municipalities affected:
•ENTIRE PAGADIAN CITY
•LABANGAN
•DUMALINAO
•TIGBAO
•GUIPOS
•SAN PABLO
•SAN MIGUEL
•LAPUYAN
•DIMATALING
•DINAS
•VINCENZO SAGUN
•MARGOSATUBIG
•PITOGO
•TABINA
•Portion of AURORA, ZDS
-Brgy. Lubid
-Brgy. Lantungan
-Brgy. Inroad
-Brgy. Resthouse
•Portion of the municipality of TUKURAN, ZDS
-excluding brgys:
x Navalan
x Laperian
x Buenasuerte
x Sambulawan
Reason/s of Interruption:
*NGCP will conduct Annual Preventive Maintenance of the 100MVA Power Transformer No.02 at Aurora Substation and Ride on Transmission line maintenance along the Aurora San Miguel 69kv line.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you.
14/02/2026
Welcome! Excited to have you onboard! Jessie James Josh, Marife Tano Araula, Rallos John Ramdeer, Genevieve Luspo Dela Cruz - Guiñea, Sanny Mar Lansana Cansancio, Julious Abayon, Jeva Nera Gepanaga, Alvin MG, Johayra Betyo Malalis Cauntongan, Onifesoj Nalutupac, Ēïñgêner Franz Rainier, Ma Zie, Tutor Faith
Pagadian Solar
28/01/2026
We also have a CST 12v-100ah battery at Pagadian Solar .
For small solar power energy set-up.
German Technology.
Click here to claim your Sponsored Listing.
Website
Address
Alta Tierra Tiguma Zone 11
Quezon City
7016
